![]() Sill anchors must be installed and all foundations walls are to be braced. At least two drain tile connections are to be left uncovered in order to verify the type of pipe fittings used as well as the stone depth. The backfill inspection is to be performed after all required damp proofing, water proofing, and after the exterior foundation drainage system is in place. ![]() The location and elevation certificate must be received and approved prior to scheduling the inspection. The inspector will check to see if site conditions, soil conditions, footing sizes, and footing placement complies with the approved plans by the builder. The footings are to be inspected prior to the placement of concrete. One set of construction documents shall be kept at the site of work and shall be open to inspection by the building official or his or her authorized representative. ![]() All earth change activities in the township shall be conducted in such a way as to prevent accelerated erosion and resulting sedimentation. Pittsfield Charter Township Code of Ordinances, Section 8 Article VI. All re-inspection fees are required to be paid prior to scheduling further inspections. The inspection will be failed and a re-inspection fee will be assessed. ![]() No inspections will be performed when proper property identification has not been provided. All property upon which houses, dwellings, buildings, mobile homes, businesses, or other structures are located or proposed to be located or constructed within the township shall be considered developed and shall have property identification. Pittsfield Charter Township Code of Ordinances, Section 6-353, Article VI. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |